PROJECTS
HHASB Track Record
Track Projects Records 2017
No | Start Date | Finish Date | Brief Scope | Location | Client |
---|---|---|---|---|---|
1 | Jun-17 | Jul-17 | Provision of Fabrication and Supply of Piping and Fitting for Angsi Package C | Onshore | Petronas Carigali Sdn Bhd |
2 | Jun-17 | Aug-17 | Provision of Fabrication and Supply of Piping and Fitting for Angsi Package A | Onshore | Petronas Carigali Sdn Bhd |
3 | Jun-17 | May-20 | Provision of Topside Major Maintenance (TMM) for Bertam Operations for Lundin Malaysia B.V. | Onshore & Offshore | Lundin Malaysia B.V. |
4 | Jun-17 | Aug-17 | C-3020 Exhaust Stack Works at Duyong B Platform | Onshore & Offshore Duyong B Platform | Deleum Services Sdn Bhd |
5 | May-17 | Aug-17 | Provision of Onshore Fabrication Works for Angsi D Platform L-165 (PL01) at DUYONG DPA | Onshore | Petronas Carigali Sdn Bhd |
6 | May-17 | Aug-17 | Provision of Blasting and Painting Works for Riser V-805, R-1320, V-835, V-890, V840 at TIONG A | Offshore Tiong A Platform | Petronas Carigali Sdn Bhd |
7 | May-17 | Jun-17 | Provision of Blasting and Painting Works for Riser V-840 & V-875 at Tiong B | Offshore Tiong B Platform | Petronas Carigali Sdn Bhd |
8 | May-17 | Jun-17 | Provision of Blasting and Painting Works for Riser L-1310, V-280 V-880, V-845 & V-270 AT Bekok A | Offshore Bekok A Platform | Petronas Carigali Sdn Bhd |
9 | May-17 | Jun-17 | Provision of Blasting and Painting Works for Riser V-140, & V-870 at Bekok B | Offshore Bekok B Platform | Petronas Carigali Sdn Bhd |
10 | May-17 | Jun-17 | Provision of Blasting and Painting Works for Riser V-890, V-858 V-850, V-840, & V855 at Bekok C | Offshore Bekok C Platform | Petronas Carigali Sdn Bhd |
11 | May-17 | Jun-17 | Angsi TMM - Provision of onshore fabrication (grating for ANPG-A Batch 1) | Onshore | Carimin Engineering Services Sdn Bhd |
12 | May-17 | Jun-17 | Angsi TMM - Provision of onshore fabrication (grating for ANDP-B) | Onshore | Carimin Engineering Services Sdn Bhd |
13 | May-17 | Jun-17 | Angsi TMM - Provision of onshore fabrication (grating for ANPG-A Batch 5) | Onshore | Carimin Engineering Services Sdn Bhd |
14 | May-17 | May-17 | Supply of Scaffolding Material for Angsi platform | Offshore Angsi | Ropetech Sdn Bhd |
15 | May-17 | May-17 | Angsi TMM - Provision of onshore fabrication (grating replacement Batch 2 & Batch 4) | Onshore | Carimin Engineering Services Sdn Bhd |
16 | Apr-17 | Apr-17 | Provision of Blasting and Painting Works for Riser L-0620 & R-4010 at Angsi ANDPB | Offshore Angsi | Petronas Carigali Sdn Bhd |
17 | Apr-17 | Apr-17 | Provision of Blasting and Painting Works for Riser L-4070 & L4090 at Angsi ANGPA | Offshore Angsi | Petronas Carigali Sdn Bhd |
18 | Apr-17 | May-17 | Demolition and installation of enclosure panel and piping works for G410C Generator at Tiong A Platform | Onshore & Offshore Tiong A Platform | Deleum Services Sdn Bhd |
19 | Mar-17 | May-17 | Provision of Blasting and Painting Works for Riser L-160 (PL01) at DUYONG DPA | Offshore Duyong DPA | Petronas Carigali Sdn Bhd |
20 | Mar-17 | May-17 | Provision of Blasting and Painting Works for Riser L-1530 (PLO3), R-10000 (PL01), R-1010 (PL02), R2910 (PL45) & R-2950 (PL53) at Duyong CPP | Offshore Duyong Platform | Petronas Carigali Sdn Bhd |
21 | Mar-17 | May-17 | Onshore Fabrication and Offshore Installation of D35 Enclosure Panel (Top Panel) for GT740 at D35 platform | Onshore & Offshore D35 | Bumi Wangsa TMS Sdn Bhd |
22 | Feb-17 | May-17 | Fabrication, installation and erection & pre-commissioning of GRE Piping Works | Onshore | Petra Resources Sdn Bhd |
23 | Feb-17 | May-17 | Supply of GRE Materials and Accessories | Onshore | Petra Resources Sdn Bhd |
24 | Feb-17 | May-17 | Provision of GRE Piping Services for Samarang EOR (Fabrication, installation and erection & pre-commissioning) | Onshore & Offshore | Petra Resources Sdn Bhd |
25 | Feb-17 | May-17 | Provision of Onshore and Offshore Services for AFUP Under OCR | Onshore & Offshore | Carimin Engineering Services Sdn Bhd |
26 | Jan-17 | Jan-22 | Provision of Topside Construction and Maintenance Services | Offshore CKP, CKR & FSO | Carigali Hess Operating Company Sdn Bhd |
27 | Nov-16 | Nov-21 | Provision of Topside Blasting and Painting Services (12 Nos Wellhead Platform, CKP, CKR and FSO) | Offshore CKP, CKR & FSO | Carigali Hess Operating Company Sdn Bhd |
28 | Nov-16 | Jan-17 | Provision of Crane Boom Replacement Work for CKP | Offshore CKP | Carigali Hess Operating Company Sdn Bhd |
29 | Jun-23 | Jun-26 | Provision of Modification Work (Umbrella) Contract | JDA | Carigali Petroleum of Thailand Operating Company (CPOC) |
30 | Jun-23 | Oct-23 | Provision of fabrication and Subsea installation of Conductor and Anode Clamp for Kayu Manis South East Development Project | Sarawak Water | Vestigo Petroleum Sdn Bhd |
31 | May-23 | Jun-24 | Provision of Engineering, Procurement, Construction, Installation and Commisioning of Kayu Manis South East Development Project | Sarawak Water | Vestigo Petroleum Sdn Bhd |
32 | Feb-23 | Feb-24 | Provision of Integrated Hook-Up Commissioning Services for Petronas Research Sdn Bhd | PMA | Petronas Research Sdn Bhd |
Track Projects Records 2018
Bil | Start Date | Finish Date | Brief Scope | Location | Client |
---|---|---|---|---|---|
1 | Dec-18 | Jan-19 | Provision of manpower, equipment, tools for pre-fabrication of piping spools, supports and instrument stand for Angsi CFIP Project | Onshore | Carimin Engineering Services Sdn Bhd / Petronas Carigali Sdn Bhd |
2 | Dec-18 | Feb-19 | Provision of manpower, equipment, tools and consumables for Dulang Onshore Fabrication for CFIP 006 Project | Onshore | Carimin Engineering Services Sdn Bhd / Petronas Carigali Sdn Bhd |
3 | Nov-18 | Mar-19 | Provision of Offshore Installation for CFIP Dulang Upgrade | Dulang Platform | Carimin Engineering Services Sdn Bhd / Petronas Carigali Sdn Bhd |
4 | Nov-18 | Jan-19 | Provision of manpower, equipment, tools and consumables for Onshore Fabrication for Dulang Piping Upgrade Package B | Onshore | Carimin Engineering Services Sdn Bhd / Petronas Carigali Sdn Bhd |
5 | Nov-18 | Nov-18 | Provision of Onshore Fabrication Shop for Task DTSM001 B2 - Supply of manpower, equipment, tools, consumables, NDT, blasting and painting. | Onshore | Deleum Primera Sdn Bhd / Petronas Carigali Sdn Bhd |
6 | Oct-18 | Nov-18 | Demolition and Installation of Enclosure Panel and Piping Works for Compressor C650B & C640B at Tiong A Platform | Tiong A Platform | Deleum Primera Sdn Bhd / Petronas Carigali Sdn Bhd |
7 | Sep-18 | Sep-18 | Provision of Supply of Manpower, Equipment, Tools and Consumables for Offshore Installation Works for Flare Ignition System Upgrade at Bekok C Platform | Bekok C Platform | Deleum Primera Sdn Bhd / Petronas Carigali Sdn Bhd |
8 | Sep-18 | Oct-18 | Provision of Supply Manpower, Tools, Equipment and Consumables for Offshore Installation Works for CTP Bypass Line Removal to TPS at Resak CPP Platform | Resak Platform | Deleum Primera Sdn Bhd / Petronas Carigali Sdn Bhd |
9 | Jul-18 | Nov-18 | Provision of Offshore Execution for Angsi-E HUC Preparation and Rig-up Campaign | Angsi E Platform | Carimin Engineering Services Sdn Bhd / Petronas Carigali Sdn Bhd |
10 | Jun-18 | Jun-18 | Provision of Onshore Fabrication Shop for Task DTSM 033 - Supply of manpower, equipment, tools, consumables, NDT, blasting and painting. | Onshore | Deleum Primera Sdn Bhd / Petronas Carigali Sdn Bhd |
11 | Mar-18 | Jul-18 | Provision of supply manpower, equipment, tools and consumables for offshore installation for Tiong A water jet pump line | Tiong A Platform | Deleum Primera Sdn Bhd / Petronas Carigali Sdn Bhd |
12 | Mar-18 | Jul-18 | Provision of supply manpower, equipment, tools and consumables for onshore fabrication and offshore installation for C2020 and C3020 Piping at Duyong B Platform | Duyong B Platform | Deleum Primera Sdn Bhd / Petronas Carigali Sdn Bhd |
13 | Feb-18 | Jan-19 | Provision of Manpower, Tools, Equipment and Consumables (Offshore Execution) for Maintenance, Construction & Modification (MCM) Services for Petronas Carigali Sdn Bhd (Blasting and Painting) | Offshore PMO | Carimin Engineering Services Sdn Bhd / Petronas Carigali Sdn Bhd |
14 | Jan-18 | Aug-18 | Provision of Offshore Manpower Services | CKR CKP & SYA | HHI Mauritus Ltd |
Track Projects Records 2019
bil | Start Date | Finish Date | Brief Scope | Location | Client |
---|---|---|---|---|---|
1 | Dec-19 | Dec-23 | Provision of Integrated Hook-up and Commissioning (iHUC) Services for Petronas Carigali Sdn Bhd (Package A – PMA) | Peninsular Malaysia Asset | Petronas Carigali Sdn Bhd |
2 | Nov-19 | Nov-22 | Provision of Heat Exchanger, Pressure Vessel and Utility Tank Maintenance Services for Petronas Carigali Sdn Bhd (Package B - PMA (Production Gas)) | Peninsular Malaysia Asset | Petronas Carigali Sdn Bhd |
3 | Nov-19 | Nov-22 | Provision of Heat Exchanger, Pressure Vessel and Utility Tank Maintenance Services for Petronas Carigali Sdn Bhd (Package A2 - SKO) | Sarawak Operations | Petronas Carigali Sdn Bhd |
4 | Jul-19 | Jul-22 | Provision Of Minor Fabrication, Offshore Installation and Testing For Structure and Piping (West Malaysia) | West Malaysia Platform | E&P O&M Services Sdn Bhd |
5 | Apr-19 | Apr-23 | Provision of Pressure Vessel Cleaning and Related Services ("Contract") | Various Platform in PMO | Repsol Oil & Gas Malaysia Limited |
6 | Apr-19 | Jun-19 | Provision of Demilition and Installation of Enclosure Panel and Piping Works for G410A Generator at Tiong A Platform | Tiong A Platform | Deleum Services Sdn Bhd / Petronas Carigali Sdn Bhd |
7 | Apr-19 | May-19 | Provision of manpower, equipment, tools and consumables to perform offshore installation activity at Dulang C and Dulang D for the H2S Scavenger Installation | Dulang C & D Platform | Carimin Engineering Services Sdn Bhd / Petronas Carigali Sdn Bhd |
8 | Mar-19 | May-19 | Provision for piping installation works for DFIP005 for MCM Project | Offshore | Deleum Services Sdn Bhd / Petronas Carigali Sdn Bhd |
9 | Mar-19 | Apr-19 | Provision for piping fabrication works for DFIP005 for MCM Project | Onshore | Deleum Services Sdn Bhd / Petronas Carigali Sdn Bhd |
10 | Mar-19 | Apr-19 | Provision for piping and structure fabrication work for Tiong A CWR (DTSM 104D) | Tiong A Platform | Deleum Services Sdn Bhd / Petronas Carigali Sdn Bhd |
11 | Mar-19 | Mar-22 | Provision of Maintenance, Construction and Modification (MCM) Services for Petronas Carigali Sdn Bhd (Package B (Offshore) - Sabah Asset) | Offshore (Sabah) | Petra Resources Sdn Bhd |
12 | Feb-19 | Apr-19 | Provision of supply material, fabricate and install 2 units Offset Ducting for 650B & C640B Compressor at Tiong A Platform | Onshore & Offshore Tiong A Platform | Deleum Services Sdn Bhd / Petronas Carigali Sdn Bhd |
13 | Feb-19 | Apr-19 | Provision of Installation for GRE Piping ANDP-E | Angsi E Platform | Carimin Engineering Services Sdn Bhd / Petronas Carigali Sdn Bhd |
14 | Dec-18 | Jan-19 | Provision of manpower, equipment, tools for pre-fabrication of piping spools, supports and instrument stand for Angsi CFIP Project | Onshore | Carimin Engineering Services Sdn Bhd / Petronas Carigali Sdn Bhd |
15 | Dec-18 | Feb-19 | Provision of manpower, equipment, tools and consumables for Dulang Onshore Fabrication for CFIP 006 Project | Onshore | Carimin Engineering Services Sdn Bhd / Petronas Carigali Sdn Bhd |
16 | Nov-18 | Mar-19 | Provision of Offshore Installation for CFIP Dulang Upgrade | Dulang Platform | Carimin Engineering Services Sdn Bhd / Petronas Carigali Sdn Bhd |
17 | Nov-18 | Jan-19 | Provision of manpower, equipment, tools and consumables for Onshore Fabrication for Dulang Piping Upgrade Package B | Onshore | Carimin Engineering Services Sdn Bhd / Petronas Carigali Sdn Bhd |
Track Projects Records 2020
bil | Start Date | Finish Date | Brief Scope | Location | Client |
---|---|---|---|---|---|
1 | Nov-20 | Nov-23 | Provision of Engineering, Procurement, Construction, Installation and Commisioning (ePCIC) of Produced Water Upgrade Project | Cakerawala | Carigali Hess Operating Company Sdn Bhd |
2 | May-20 | Nov-20 | Provision of Onshore Fabrication for Inconel 825 and Stainless Steel Piping for CP LPC GT6 Dry Gas Seal | Kuala Belait, Brunei Darussalam | NUQUEST Sdn Bhd / Brunei Oil |
3 | Mar-20 | Oct-20 | Provision of Piping Fabrication and Installation ( CKX Booster Compression Project) | Cakerawala | HHI Mauritus Limited / Petronas Carigali Sdn Bhd |
Track Projects Records 2021
bil | Start Date | Finish Date | Brief Scope | Location | Client |
---|---|---|---|---|---|
1 | 17 Nov 2020 | 17 Nov 2020 | Provision of Engineering, Procurement, Construction, Installation and Commissioning (ePCIC) of Produced Water Upgrade Project for Cakerawala Platform | Cakerawala | Carigali Hess Operating Company (CHOC) |
2 | 1 Apr 2020 | 15 Oct 2021 | Provision of Engineering, Procurement, Construction and Hook-Up & Commissioning (EPCC) for Padang K5 Redevelopment Project (Under Contract of Provision of iHUC Services for PCSB) | Padang K5 | Petronas Carigali Sdn Bhd |
3 | 15 Feb 2021 | 15 Oct 2021 | Provision of Bekok-A & Bekok-B Platform Readiness for Bekok-AA & Bekok-BB Bridge Tie-in. | Bekok A & B | Petronas Carigali Sdn Bhd |
4 | 7 Oct 2021 | 10 Nov 2021 | Provision to Supply Manpower, Equipment & Materials for EIAC & ALES Cleaning, and Inspection by MCI at Bekok C Platform | Bekok C | Petronas Carigali Sdn Bhd |
5 | 1 Sept 2021 | 25 Sept 2021 | Petronas Carigali Sdn Bhd Provision of Maintenance Cleaning & Inspection on HX-700B During Bekok-A Platform Shutdown 2021 for PCSB PMA | Bekok-A | Petronas Carigali Sdn Bhd |
6 | 21 Aug 2021 | 13 Sept 2021 | Provision to Perform Cleaning & Maintenance on Fuel Gas Heater (E-2160) During Duyong TA 2021 for PCSB PMA | Duyong | Petronas Carigali Sdn Bhd |
7 | 14 Jun 2021 | 14 Jul 2021 | Provision to Perform Cleaning & Maintenance of V-140C, V-130C & E-110CX-1 and Supply Materials & Equipment for V-300C, V-370C & V-360C Cleaning by CMPE for EIAC Inspection at Duyong-C Platform for PCSB-PMA | Duyong | Petronas Carigali Sdn Bhd |
8 | 20 Aug 2021 | 5 Sept 2021 | : Provision of Maintenance Cleaning & Inspection for Waste Heat Recovery Unit (WHRU) HX-820 A/B & F-690 Saddle Repair at Bekok C Platform for PCSB PMA | Bekok C | Petronas Carigali Sdn Bhd |
9 | 29 Oct 2021 | 25 Nov 2021 | Provision of Maintenance Cleaning, Blasting & Painting for V-610 & V-620A/B for Tiong | Tiong | Petronas Carigali Sdn Bhd |
10 | 1 Nov 2021 | 28 Nov 2021 | Provision to Perform P Finding Rectification Activity at Duyong Platform for PCSB PMA | Duyong | Petronas Carigali Sdn Bhd |
11 | 6 Jul 2021 | 2 Aug 2021 | Provision to Perform 11 Units Heat Exchanger Cleaning for EIAC Inspection and Supply Materials and Equipment for V-9650, V-9690 Cleaning by CMPE Team at Resak Platform for PCSB PMA | Resak | Petronas Carigali Sdn Bhd |
12 | 4 Aug 2021 | 17 Aug 2021 | Provision of E-1390X Glycol Reboiler Gasket Replacement at Duyong-CPP Platform for PCSM PMA | Duyong | Petronas Carigali Sdn Bhd |
13 | 6 Jun 2021 | 1 Jul 2021 | Provision to Perform Cleaning & Repair at DCPP V-1040 (LP Slug Catcher), V-1110 (Coalescer) And Cleaning For EIAC Inspection At DGCP E-3030 & E-3050 Air Fin Cooler At Duyong Platform For PCSB-PMA | Duyong | Petronas Carigali Sdn Bhd |
14 | 1 Nov 2021 | 23 Nov 2021 | Provision of Cleaning & Repair for Pressure Vessel V-75A/B and S-100 During Tukau Turnaround at TKK-A & TKJT-G for PCSB SKA | Tukau | Petronas Carigali Sdn Bhd |
15 | 3 Oct 2021 | 17 Oct 2021 | Provision of Five (5) Unit Pressure Vessel Maintenance Cleaning during WLK August TA 2021 Onboard West Lutong for PCSB SKA | West Lutong | Petronas Carigali Sdn Bhd |
16 | 3 Oct 2021 | 17 Oct 2021 | Provision of V-300 Maintenance Cleaning & Build Up Repair during WLK August 2021 TA Onboard West Lutong for PCSB SKA | West Lutong | Petronas Carigali Sdn Bhd |
17 | 1 Nov 2021 | 23 Nov 2021 | Provision of Maintenance Cleaning for Pressure Vessel and V-100 (TKP-B) Preservation during Tukau Turnaround for PCSB SKA | Tukau | Petronas Carigali Sdn Bhd |
18 | 20 Aug 2021 | 13 Sept 2021 | Provision of Instrument Gas Scrubber (S-315) Maintenance Cleaning Activity During June 2021 Maintenance Shut Down at Baram Platform | Baram | Petronas Carigali Sdn Bhd |
19 | 2 Oct 2021 | 18 Oct 2021 | Provision of HP Flare KO Drum (V-540) Maintenance Cleaning during August Shut Down 2021 at D-35 Platform | D-35 | Petronas Carigali Sdn Bhd |
20 | 20 Aug 2021 | 13 Sept 2021 | Provision of Five (5) unit Heat Exchanger & Four (4) Pressure Vessel Maintenance Cleaning, Nozzle Replacement & Maintenance Painting during Maintenance Shut Down at Baram Platform | Baram | Petronas Carigali Sdn Bhd |
21 | 20 Aug 2021 | 13 Sept 2021 | Provision of Pressure Vessel Maintenance Cleaning, Nozzle Replacement & Schoepentoeter Re-Instatement for 1st Stage Suction Scrubber (S-7100) During unit Shut Down at Baram Platform | Baram | Petronas Carigali Sdn Bhd |
22 | 20 Feb 2021 | 10 Mac 2021 | Provision for Gas-lift Compressor Discharge Scrubber (V-7106B) Maintenance Cleaning & Nozzle (N3) Repair at WLK-S for PCSB SKO | SKO | Petronas Carigali Sdn Bhd |
23 | 23 Mac 2021 | 14 Apr 2021 | Provision for V-200 & V-300 Unit Shut Down Maintenance Cleaning at Tukau for PCSB SKO | SKO | Petronas Carigali Sdn Bhd |
24 | 12 Apr 2021 | 15 Mei 2021 | Provision of Pressure Vessel Cleaning & Internal Upgrade for HP Separator & Water Skimmer at Tembikai Platform | Tembikai | EPOMS |
25 | 6 Apr 2021 | 24 Apr 2021 | Provision of FSO Tank Cleaning - Sand Removal at Bottom of Cargo Tank 1C & 3C - TCMS 0735 | Cakerawala | Carigali HESS Operating Company Sdn Bhd |
Track Projects Records 2022
bil | Start Date | Finish Date | Brief Scope | Location | Client |
---|---|---|---|---|---|
1 | 27 Nov 2020 | 26 Oct 2022 | Provision of Pre-Filter Modification Work at Baronia Platform | Baronia | Hyundai Heavy Industries |
2 | 11 Jan 2021 | 31 Oct 2022 | Provision of Procurement, Construction and Hook-Up & Commissioning (PCC) for Dulang 2.0 Redevelopment 2.0 Infill Drilling (Under Contract of Provision of iHUC Services for PCSB). | Dulang 2.0 | Petronas Carigali Sdn Bhd |
3 | 15 Feb 2021 | 15 Aug 2022 | Provision of Detail Engineering of PM9 Simplification and Procurement for Bekok B First Hydrocarbon (Under Contract of Provision of iHUC Services for PCSB). | Bekok B | Petronas Carigali Sdn Bhd |
4 | 05 Jan 2022 | 30 Nov 2022 | Integrated Bekok Oil: Provision of Procurement of Materials for Module 9. Supply and Delivery of One (1) Slug catcher (V-2010) And Two (2) Booster Compressor Suction Scrubbers (V-2410a/B) For Module 9. | Module 9, Tiong-A | Petronas Carigali Sdn Bhd |
Track Projects Records 2023
bil | Start Date | Finish Date | Brief Scope | Location | Client |
---|---|---|---|---|---|
1 | 1 Mar 2022 | 1 March 2022 | Provision of Procurement, Construction and Hook-Up & Commissioning (PCC) for Bekok-B Brownfield PM9S Execution (Under Contract of Provision of iHUC Services for PCSB) | Bekok B | Petronas Carigali Sdn Bhd |